Case (a)
in Mining
|
|
Case (a) in Mining
Industry
Customer:
Anshan Iron and Steel
Co., the largest iron and steel
company in China Application:
Tailings
slurry Old
pumps: 12PNB-7, single-stage,
centrifugal pumps Problems:
Solutions
and Results:
Pumps, well designed and made of
more wear-resistant material, were
the right solutions. To solve the
problems, 300ZJ-I-A100 pumps made
by Shijiazhuang Industrial Pump
Factory were used to replace the
old pumps. The results are:
-
The
new pumps can last for more
than five months on average.
-
Each
pump saves more than
650,000kwh per year.
<To
Top>
|
|
Case (b)
in Mining
|
|
Case (a)
in Power Generating
|
|
Case (b)
in Power Generating
|
|
Case (a)
in other area
|
|
|
|
|
|
|
|
|
|
|
|
Case
(b) in Mining Industry
Customer:
Jinchuan Non-Ferrous Metals,
Co. Application:
Ore slurry from ball mill Old
pumps: 8SPJ, single-stage,
centrifugal pumps Problems:
Solutions
and Results:
The
problems were with hydraulic design
and construction material. To solve the
problems, 200ZJ-I-A60 pumps with
expeller made by
Shijiazhuang Industrial Pump Factory
were used to replace the old pumps.
The results are:
-
The
new pumps can last for more than
six months on average.
-
Leaking
problem has completely been
solved.
-
Pump
efficiency is now 75% compared
with 60%.
<To
Top>
|
|
|
|
|
|
|
|
Case
(a) in Coal-fired Power Plants Customer:
The Heating and Power Plant of
Tianjin Application:
Ash and Cinder Slurry Old
pumps: 10PH, single-stage,
centrifugal pumps Problems:
Solutions
and Results:
The
problem was due to high NPSHr of the
old pumps. To solve the
problem, 250ZJ-I-A75 pumps made by
Shijiazhuang Industrial Pump Factory
were used to replace the old pumps.
By replacing the old pumps, not only
the vibration problem has been
solved, but also the pump service
life has been improved to about
twelve months from six months and
the pump efficiency to 76% from
67%. <To
Top>
|
|
|
|
|
|
|
|
Case (b)
in Coal-fired Power Plants Customer:
The Power Plant of Tanshan Application:
Ash and Cinder Slurry Old
pumps: MD450, two-stage,
centrifugal pumps. Problems:
-
Shaft
seal, packing, could only last
hours.
-
Wet
parts could only last about one
month.
Solutions
and Results:
To
solve the problems, two 250ZJ-I-A75 pumps
with expellers were operated in
series to replace the old two-stage pumps.
Now:
<To
Top>
|
|
|
|
|
|
|
|
Case
(a) in other area Customer:
Saskatchewan Research Council,
Saskatchewan, SK Application:
Doing research on various
slurries such as froth, clay, sand, etc. Pump
Type: 80ZJ-I-A42
<To
Top>
|
|
|
|
|
|